Case Studies

Fountain Lake CDF Groundbreaking Ceremony

The Shell Rock River Watershed District (SRRWD) will today host a Groundbreaking Ceremony for the Fountain Lake Restoration Project Confined Disposal Facility (CDF). “This is a historic day for the Shell Rock River Watershed District and our community. Years of

Read more

Istanbul, Turkey

Prototype 4 IMS had the opportunity to demonstrate the GeoPool – 4 Prototype during the remediation of the Golden Horn River located in Istanbul Turkey. The project initially utilized a Tri-Flo mechanical dewatering system to manage the dredging slurry. However,

Read more

Fullerton, ND

8′ Commercial GeoPool Once the upgrades from Prototype 4 were proven to work, we redesigned the Geo-Pool frames to be stronger and lighter using the heavier square tubing material. This also made the pools vastly more portable. To increase capacity,

Read more

Arnegard Dam, ND

Prototype 3 IMS was engaged by the North Dakota Fish and Game Department to remove 40,000 cubic yards of sediment from the Arnegard Reservoir and demonstrate the Geo-Pool dewatering technology. On prototype 3, we used the type 2 frames, added

Read more